Customization: | Available |
---|---|
After-sales Service: | One Year Since Machine Was at Buyer′ Factory |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Type | 560 | 550 | 450 | 350 |
Material Intensity | δb≥110kg/mm2 | 120kg/mm2 | 128kg/mm2 | δb≤140kg/mm2 |
Max. Dia. Of Inlet Wire | 6.5mm-4.4mm | 6.5mm | 4mm | 2.6-1.5mm |
Min. Dia. Of Outlet Wire | 2.6mm-1.8mm | 2.2mm | 1.6mm | 1.2-0.8mm |
Block | 1 | 1 | 1 | 1 |
Max. average condensation | 0.3 | 20% | 20% | 21% |
Total Condensation | 78-88.5% | 78% | 77.90% | 78% |
Max. Speed of Block | 245m/min | 260m/min | 280m/min | 200m/min |
Total Power | 22/30kw | 18.5/22kw | 11/15kw | 5.5/7.5kw |
Accessory Equipment
Name | Model | Range of Dia. |
Discharging Machine | ||
Pointing Machine | F-96 | 6.5-1.5mm |
Pointing Machine | F-80 | 3.5-1.0mm |
Butt-Welding Machine | UN-10 | 8--2mm |
Butt-Welding Machine | UN-3 | 6.5-1.5mm |
Butt-Welding Machine | UN-1 | 3.5-1.0mm |
Automatic Discharging Machine | XB-600 | capacity 800kg |
Automatic Discharging Machine | XB-360 | capacity 400kg |
I Type Spool Reeling Machine | SG-800 | capacity 800kg |
I Type Reeling Machine | SG-630 | capacity 500kg |
Descaling Machine | SW650 | |
Motorless Descaling Machine | with steel brush | |
Well Type Furnace | RJ-90-9 |
Guarantee and after-service:
1. Guarantee time: one year since machine was at buyer' factory within 12 months against B/L date
2. Within guarantee time, if any components are broken under normal condition, we can change for free.
3. We can send our best technician to buyer's factory for installation, debugging and training.
4. Complete installation instructions, circuit diagram, manual operations and machine layout.
5. Technical support by e-mail.
FAQ:
Regarding spare part
Q: What is usage of wire drawing powder?
A: Wire drawing powder is put in die box, which is to lubricate and protect the wire.
Q: Consumption of wire drawing powder?
A: 2kg powder for drawing 1 ton of wire.
Q: Consumption of wire drawing die?
A: One piece of wire drawing die min. for drawing 20-30 tons of wire.
Q: Changing the wire drawing die on wire drawing machine is complicated?
A: Changing wire drawing die is not complicated.
Q: Can we change dia. of outlet wire by changing the wire drawing die?
A:Surely machine can draw different size of wire if you change drawing die, but diameter of wire must be within production range of machine.
Regarding auxiliary equipment
Q: Do we really need descaling unit as a part of wire drawing process?
A: Descaling is needed before drawing, it is used to remove rust and oxide on surface of wire.
Q: Pointing machine is necessary?
A: Yes, it is used for sharpening the wire, then wire could pass through wire drawing mold.
Q: Butt-welding machine is necessary?
A: Yes, it is used to weld the wire if it is broken during being drawn.
Regarding to electrical supply
Q: What is the power of machine?
A: Our machine is with different power according to different requirement for drawing wire, detailed pls refer to our quotation.
Q: What is electrical supply of machine?
A: Our machine normally is 380V, 3P, 50Hz, but it could be as your requirement.
Other questions
Q: Your machine has CE Certificate?
A: Yes.
Q: Pls quote CFR Price to XXX port.
A: Pls let us know which machine and quantity of machine you plan to buy, then we will calculate packing volume and sea freight to XXX port accordingly.
Q: How many worker is needed to operate the machine?
A: 2 workers for one wire drawing line.
Q: How to pack the machine?
A: Machine normally is covered by plastic film.
Q: What is delivery time of machine?
A: Delivery time is subject to machine model and quantity of machine you plan to purchase. Normally it is about 60 days after receipt of your down payment.
Q: Could you let me know how many space needed for install the machines?
A: Pls provide us layout of your workshop and quantity of machines, then we will provide you layout of workshop with all machines.
Q: Give me an idea on the operation of equipment.
A: We will send you operation manual of machine after you place order and before you get the machine.
Q: How long do installation and trial running of machine take?
A: If foundation and everything is prepared, time of installation and trial running is about 10 working days.